Worcester 24i Junior Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Termóestatos Worcester 24i Junior. Worcester 24i Junior User manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 62
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
THE APPLIANCE IS FOR USE WITH
NATURAL GAS OR L.P.G. (Cat II 2H3P TYPE C13 & C33)
NATURAL GAS:
WORCESTER GREENSTAR 24i junior GC NUMBER 47-311-86
WORCESTER GREENSTAR 28i junior GC NUMBER 47-311-87
LIQUID PETROLEUM GAS:
WORCESTER GREENSTAR 24i junior GC NUMBER 47-311-90
WORCESTER GREENSTAR 28i junior GC NUMBER 47-311-91
GB/IE
CHECKLIST & service
interval record, printed within this
manual
Vista de página 0
1 2 3 4 5 6 ... 61 62

Resumo do Conteúdo

Página 1 - CHECKLIST & service

THE APPLIANCE IS FOR USE WITHNATURAL GAS OR L.P.G. (Cat II 2H3P TYPE C13 & C33)NATURAL GAS:WORCESTER GREENSTAR 24i junior GC NUMBER 47-311-86WORCE

Página 2 - SERVICING INSTRUCTIONS

MAINS SUPPLYELECTRIC SUPPLY:• Supply: 230V - 50Hz, 140 watts • Cable: PVC insulated 0.75mm2(24 x 0.2mm)temperature rated to 90°C.• External 3A fuse to

Página 3 - CONTENTS

WATER SYSTEMS & PIPEWORKPLASTIC PIPEWORK:• Any plastic pipework must have a polymeric barrier with 600mm (minimum) length of copper or steel pipe

Página 4

CONDENSATE PIPEWORKCONDENSATE PIPEWORK:• The condensate pipe must be a minimum of 22mmØ plastic pipe.• The condensate pipework must fall at least 50mm

Página 5 - GENERAL INFORMATION

PRESSURE RELIEF PIPEWORKPRESSURE RELIEF PIPEWORK:• The pressure relief drain pipe (M) from the boiler should be at least 15mm diameter copper pipe and

Página 6 - TECHNICAL DATA

BOILER LOCATION & CLEARANCESINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)13PRE -

Página 7 - LAYOUT & COMPONENTS

BOILER LOCATION & CLEARANCESINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)14PRE -

Página 8

PLUMBING MANIFOLDCONNECTIONS:Heating System: 22mm compression fittingsDHW: 15mm compression fittingsGas: 22mm compression fittingsUse the fittin

Página 9 - CLEANING PRIMARY SYSTEMS

PRE -INSTALLATIONFLUE TERMINAL POSITIONS• The flue must be fitted and terminated in accordance with the recommendations of BS5440 : Part 1.• The flue

Página 10 - MAINS SUPPLY

FLUE OPTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)17PRE -INSTALLATIONFLUE OPT

Página 11 - WATER SYSTEMS & PIPEWORK

IIMPORTANT: All the previous Pre-Installation sections must be readand requirements met before starting boiler or flue installation.EFABCCDGUNPACKING

Página 12 - CONDENSATE PIPEWORK

SYMBOLS USED IN THIS MANUAL:WORCESTER:TECHNICAL: 08705 266241SERVICE: 08457 256206SPARES: 01905 752571LITERATURE: 01905 752556TRAINING: 01905 752526SA

Página 13 - PRESSURE RELIEF PIPEWORK

WALL MOUNTING PLATE FLUE OPENINGINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)19INSTA

Página 14 - 8 716 107 336b (11/05)

476UNPACKING THE APPLIANCEUNPACKING THE APPLIANCEA - Outer cartonB - Inner sleeve (unwraps from front)C - Packaging baseD - Protective wrappingE - App

Página 15 - CLEARANCES

AEDBBOILER CONNECTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)21INSTALLATIONHan

Página 16 - PLUMBING MANIFOLD

BOILER CONNECTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)22INSTALLATIONBOILER

Página 17 - FLUE TERMINAL POSITIONS

FLUE INSTALLATIONINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)23INSTALLATIONFLUE INS

Página 18 - FLUE OPTIONS

FLUE INSTALLATIONINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)24INSTALLATIONFLUE INS

Página 19 - ANCILLARY ITEMS

FLUE INSTALLATIONINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)25INSTALLATIONABCDEA -

Página 20 - FLUE OPENING

CONDENSATE CONNECTION:Never terminate or discharge into any opensource, including; sink, bath, shower, bidet,toilet etc.Note: any external condensate

Página 21 - UNPACKING THE APPLIANCE

ELECTRICSA12BELECTRICSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)27INSTALLATIONCAU

Página 22

POSITION OF WIRED COMPONENTSCOMMISSIONINGPOSITION OF WIRED COMPONENTSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28

Página 23 - BOILER CONNECTIONS

SAFETY & REGULATIONSSAFETY PRECAUTIONS & SYMBOLS 3INSTALLATION REGULATIONS 3APPLIANCE INFORMATIONGENERAL INFORMATION 4TECHNICAL DATA 5LAYOUT &

Página 24 - FLUE INSTALLATION

PRE-COMMISSIONING CHECKSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)29COMMISSIONING

Página 25

FILLING THE SYSTEMINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)30COMMISSIONINGFILLIN

Página 26

ADFCBGEHISwitching the appliance on/off:1  Turn on mains power supply Turn on any external controlsSet the thermostatic radiator controls to maximum

Página 27 - CONDENSATE CONNECTION

WATER TREATMENTENSURE THAT THE SYSTEM HAS BEENCLEANED AS ON PAGE 8 OF THESEINSTRUCTIONS.FLUSHING (Central Heating):1 Switch off the boiler (A).  Open

Página 28 - ELECTRICS

COMMISSIONINGTHE COMBUSTION FOR THE APPLIANCEIS FACTORY SET. NO ADJUSTMENT IS REQUIRED IF THEGAS INLET PRESSURE IS CORRECT.CHECKING GAS INLET PRESSURE

Página 29 - COMPONENTS

FINISHING COMMISSIONINGINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)34COMMISSIONINGF

Página 30

INSPECTION AND SERVICE To ensure the continued efficient operationof the appliance it must be checked atregular intervals.  The frequency of servici

Página 31 - FILLING THE SYSTEM

INSPECTION AND SERVICEComponent Access1. Removing outer case1. Remove bottom panel by pulling it forward and off.1.1 Undo and remove 2 screws (A) secu

Página 32 - STARTING THE APPLIANCE

INSPECTION AND SERVICESetting Boiler to Maximum.NOTE: When running in the service mode, theboiler will operate both the Central Heating andDHW circuit

Página 33 - WATER TREATMENT

INSPECTION AND SERVICETo Clean the Heat Exchanger1 With outer case and base panel removed and the power isolated from the appliance, remove the cover

Página 34 - COMMISSIONING

SAFETY PRECAUTIONS& INSTALLATION REGULATIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336

Página 35 - FINISHING COMMISSIONING

INSPECTION AND SERVICE4 Remove electrical connector from fan.5 Undo and remove securing nut (E) from the top of the heat exchanger.6 Remove stainless

Página 36 - INSPECTION AND SERVICE

QINSPECTION AND SERVICEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)40SERVICING&

Página 37 - Primary Heat Exchanger

CAUTION: TURN OFF THE GAS SUPPLY AND ISOLATE THE MAINSSUPPLIES BEFORE STARTING ANY WORK AND OBSERVE ALLRELEVANT SAFETY PRECAUTIONS.IMPORTANT: AFTER

Página 38

REPLACEMENT OF PARTS5. Moving boiler control to serviceposition5.1 Remove screw (A) securing control.5.2 Gently pull forward.6. Gas valve Isolate gas

Página 39 - To Clean the Heat Exchanger

REPLACEMENT OF PARTS9. Access to boiler control components Remove 3 screws (A) and remove cover from control.10. PCB fuse Remove fuse F1(B) from the

Página 40

12.3REPLACEMENT OF PARTS12. Replacing control The control is supplied within its plastichousing. The complete unit must be replaced. Remove ALL elect

Página 41

REPLACEMENT OF PARTS13. Air / gas manifold and fanassembly Remove electrical connector from fan. Remove wire clip from gas valve outlet thenpull gas

Página 42 - 4. Flue overheat thermostat

REPLACEMENT OF PARTS15. Fan15.1Remove 3 screws (A) retaining mixing chamber.15.2Remove 2 screws (B) retaining the fan to the air/gas manifold.15.3Remo

Página 43 - 8. Siphon

REPLACEMENT OF PARTS19. Diverter valve motorInsure the appliance is in service mode (there is no need to drain the appliance).Disconnect the electri

Página 44 - REPLACEMENT OF PARTS

REPLACEMENT OF PARTS23. Pump headEnsure the boiler is fully drained (see draining the appliance).Disconnect the electrical connection from the botto

Página 45 - 12. Replacing control

GENERAL INFORMATIONSTANDARD PACKAGE:A - Wall hung gas fired condensing combi boiler forcentral heating and domestic hot waterB - Boiler support frameC

Página 46 - 14. Pressure switch

REPLACEMENT OF PARTS27. Hydraulic BlockEnsure the appliance has been fully drained (see draining the appliance).Disconnect the electrical connection

Página 47 - 18. Heat Exchanger

REPLACEMENT OF PARTS29. Plastic protection deviceEnsure the system is fully drained (see draining the appliance).Disconnect all pipes connected to t

Página 48 - 22. DHW temperature sensor

REPLACEMENT OF PARTS31. Bypass valveRemove the Hydraulic block from the boiler (See Removing the Hydraulic Block).31.1Remove the two spring clips at

Página 49

33. Setting the CO2Note: When running in the service mode, theboiler will operate both the central heating &DHW circuits. This is to allow suffici

Página 50 - 28. CH pressure relief valve

SHORT PARTS LIST1 FanWORCESTER Part No. 8 717 204 453 0GC No. H26 5362 BurnerWORCESTER Part No. 8 718 120 609 0GC No. H26 5383 Gas valveNG WORCESTER P

Página 51 - 30. DHW Heat exchanger

1.1 1.2A2.22.32.13CBTHE GAS / AIR RATIO MUST BERESET AFTER CONVERSION. THEPROCEDURE CAN BE FOUND INTHE REPLACEMENT PARTS SECTIONOF THIS MANUAL.4.1 4.2

Página 52 - Removing boiler

FAULT FINDINGINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)55FAULT FIN DING& DIAG

Página 53 - 33. Setting the CO

CENTRAL HEATING FUNCTIONNOYESPOWERSWITCH ONCENTRALHEATINGDEMANDFan tostartspeed.Diverter valvein CH positionPump ON.IGNITIONSEQUENCE(see detail)BLUELI

Página 54 - SHORT PARTS LIST

Wait5 secondsIGNITIONSEQUENCE(see detail)PREHEAT AND DHW FUNCTIONNOYESPOWERSWITCH ONTap open(recognisedby flow turbine)Diverter valvein DHWpositionPum

Página 55 - L.P.G. CONVERSION

PROTECTION FUNCTIONBoiler temperaturebelow 8°CRun autofroststatfunctionPump antiseizePump run 5 secondsevery 24hrsPROTECTION FUNCTIONINSTALLATION &

Página 56 - R (from external

TECHNICAL DATAINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior8 716 107 336b (11/05)5TECHNICAL DATAAPPLIANCEI

Página 57 - IGNITION SEQUENCE

CONTROLS To comply with the Building Regulations, each section must have a tick in one or other of the boxesTIME & TEMPERATURE CONTROL TO HEATING

Página 58 - PREHEAT AND DHW FUNCTION

SERVICE INTERVAL RECORDIt is recommended that your heating system is serviced regularly and that you complete the appropriate Service Interval Record

Página 59 - PROTECTION FUNCTION

EXCELLENCE COMES AS STANDARDWorcester, Bosch GroupCotswold Way, Warndon, Worcester WR4 9SW.Tel. 01905 754624 Fax. 01905 754619Worcester, Bosch Group i

Página 60 - COLLECTIVE MARK

LAYOUT & COMPONENTSThe diagram opposite shows the controls in theservicing position and excludes the outer case. 1 AIR / GAS MANIFOLD2FAN3 AIR / G

Página 61

LAYOUT & COMPONENTS10 PLATE TO PLATE DHW HEAT EXCHANGER32 SYSTEM PUMP36 FLOW TURBINE37 UNUSED PORT38 AUTO AIR VENT39 FLOW CONNECTION FROM BOILER H

Página 62 - Check List

CLEANING PRIMARY SYSTEMSBEFORE CLEANING THE SYSTEM:ENSURE THE SYSTEM AND PIPEWORK ISIN GOOD WORKING ORDERKEEP THE EXISTING BOILER/CIRCULATING PUMP WHE

Comentários a estes Manuais

Sem comentários